Realization Of Technical Studies Of The Development Of An Art Work At The Douar Zriaat: Topographic Raising. - Plans And Details - Estimates Of The Work. - Before Mertrated Business Consultation File. Realization Of Technical Studies And Monitoring Of The Development Of A Track Or Douar Aissa With A Length Of 1.7Km Of A Track In Douar A A Ahmed Of 0.5 Km Long And A Track At Douar Ouled Allal Belkhdim In Length Of 1.3 Km And Followed By The Construction Of A Track At The Douar Ouled Alilich Korzit Of 0.27 Km And Followed By The Douars: Jdid-Tisghli-Ait Ben Ahmed-Zriaat-Lhadada-Ait Aissa-Ouled Alilich Korzit- Ouled Alilich Lahouanet And Followed By The Electrification Works Of Households In Douars: Jdid-Ait Ben Ahmed-Lhadada-Ait Aissa-Ouledaalilichkorzit- Ouled Alilich Lahouanet: And Details- Estimates Of The Work.