The Purpose Of This Contract Is To Draft A Construction Project That Allows The Subsequent Execution Of A New North Ditch In The Salt Valley With Greater Hydraulic Capacity, Which Collects The Surface Runoff And The Waters Of The Sludge Of The Sludge And To Prevent The Runoff Water From Reaching The Bottom Of The Salt Valley And Infiltrating The Ground, Causing Dissolution And Instability.