1. Rehabilitation Of The Damaged Section Of The Reinforced-Concrete Channel In The Village Of Tsinagola In Tsinagola 1. Works To Be Performed In 2025 - Gel 50000.00; 2. Works To Be Performed In 2026 - 24400.00 Gel. 2. 1. Works To Be Performed In 2025 - 60000.00 Gel; 2. Works To Be Performed In 2026 - 27100.00 Gel.