Wide Work Buildings: - 340 Tb Of Steels - 2,600 M3 Of Concrete - 7,000 M2 Of Formwork Earthworks / Embankments - 2,600 M3 Earthworks - 1000 M3 Of Metal Frames - 48 Tb Of Wooden Frame Steels - 900 M3 Of Glued Lamellé - 14,500 M2 Of Wood With Multiple Boxes - 4100 M2 Dressed In Wooden Facades - 7150 M2 Of Vegetated Roof Complexes - 1050 M2 Of Wood -Alu Walls -Rideaux - 1125 Ml Steel Steel Lip 30X3.5Mm - 1325 Ml Of Stainless Steel Levels 30X3.5Mm - 1500 Ml Of Cable - 4550 Ml Of Empty Tubes - 740 Ml Of Evacuation Driving Pp The Duration Of The Work Is 410 Working Days, To Start In Early 2026. The Work Was Sold At Unit Prices