Wide Work Buildings: 3,800 Tb Of Steels, 28,000 M3 Of Concrete, 72,000 M2 Of Formwork, 80 Tb Of Metal Frame Earthworks / Embankments: 11,000 M3 Earthworks, 11,000 M3 Of Special Technical Embankments: 2500 Ml Of Steel / Stainless Steel / Stainless Steel 30X3.5Mm, 2000Ml Of Cable, 5000Ml Of Empty Tubes, 740 Ml Of Evacuation Driving Work Is 240 Working Days, To Be Started In Early 2026. The Work Was Sold At Unit Prices