Purpose Of The Work: Development Of A Shared-Space In The Rue De L'Eglise And Rue Du Fossé Without Differences In Levels Between The Roadway And The Sidewalk With Renewal Of Various Networks. Succinte -Market Description - Civil Engineering Work Earthworks (Roads + Trenches): 7,600M3 Embankments (Roads + Trenches): 7,600M3 Dallage 30X60Cm: 2,750.00 M² Slabs: 520.00M Colorful Coated: 180 To Cornières For Bins Planted In Corten Steel: 320M Pipeline (Wastewater And Rainwater): 720M Water Driving Work: 520M Various Network Work Start/Duration Of Work: September 2025/400 Working Days