Commissioning Of The Absorption Heat Pump Installation In Order To Obtain Additional, Minimum Thermal Power From 2 Heat Pumps, Amounting To 2 Mwt In Total, On The Lower Heat Source Side, At The Waste Neutralisation Plant In Szczecin.