Supply, Integration, Testing And Commissioning Of Microprocessor Controlled Igbt Based 3 Phase Prop Ulsion Equipment For Middle Basic Unit For Emu (For Augmentation Of On Board - 12 Car Rake To 15 Car Rake) As Per Rd So Specn.No.Rdso/Pe/ Spec /Emu/0163 (Rev-2) 2021 Along With Relevant Addendum/Corrigendum And All Annexure S Including Annexure Xvii And Excluding Annexure Xviii Of The Specification As Applicable To Purchase Order No. 082 20199D01442 Dt.11/05/2022. (One Set Of Electrics Consists Of One Htc/Ndtc + One Mc + One Tc). [ Warranty Peri Od: 30 Months After The Date Of Delivery ] ]