Construction de la premiere phase (75 000 m3/jour) de l'usine de traitement d'eau potable basee sur le captage de la riviere LULUA, y compris la fourniture et la pose des conduites des refoulements et de distribution gravitaire ainsi que la construction des reservoirs de stockage dans la ville de Kananga dans la province du Kasa"i Central // Construction of the first phase (75,000 m³/day) of the drinking water treatment plant based on water abstraction from the Lulua River, including the supply and installation of pumping and gravity distribution pipelines, as well as the construction of storage reservoirs in the city of Kananga in the Kasaï Central province.